|
|
|
|
|
by looofooo0
181 days ago
|
|
Germany at its best, instead of keeping its 20GW+ nuclear power running and get district heating pipes installed to them, they engineer this solution at x times the cost. In this case a 30km pipe from Philippsburg NPP would have done the trick. |
|