|
|
|
|
|
by fifilura
198 days ago
|
|
If you pump the water back into the existing reserviors you will have less flooding? I suggested a pump-water extension to existing hydro power reservoirs. Like your EV recharges when you release the pedal. Right shouldn't talk about EVs with a Finn, that analogy will not fly. Ok, like if you plan carefully where you throw up your koskenkorva you can re-use it. |
|
There's a reason we're looking at using old mines for pumped hydro rather than trying to pump water upriver during a spring flood because other power sources have surplus generation.