The original stated goal was to 10x the speed of existing tunnel boring machines by bringing up the cutting head RPMs, automating liner installation, and speeding up spoil removal with electric sleds. Which would seem like a good bet, except that there are a million other bottlenecks to the process. On top of that, it doesn't seem like they even solved their core problems. It would be cool if they'd post a postmortem or something, but I get the impression that reporting bad news is a good way to get fired in an Elon-run organization. |
|
The costs of surveys, hvac, seismic research and maintenance required to keep a deep-underground tunnel going are much higher than cut-and-cover. So, even if tunnel boring was free, it still wouldn't make sense to prefer it over other options. There are very scenarios where deep-tunneling makes sense (dense cities, across rivers when bridges are infeasible), but they're the minority.
In most transit projects, cut-and-over is blocked not because it's a bad technical option. It's because NIMBYs refuse to permit on-the-ground disruptions or noise of any type. San Jose is the canonical example. It's a political problem, not a technical one.