|
|
|
|
|
by throwaway31131
197 days ago
|
|
I had the same difficulty. i.e. what was the issue that caused a headcount reduction from a 1000 to 10 or less? It’s possible the organization had larger issues than generated code but again, difficult to draw conclusions without details. |
|