|
|
|
|
|
by Vinnl
204 days ago
|
|
At the same time, unplanned engineering time is almost always more expensive than planned engineering time. I'd rather have some regular, expected, upgrade work, than all of a sudden having to scramble because I need something at a moment when I didn't plan for that. |
|