Hacker News new | ask | show | jobs
by dwd 205 days ago
When you have the electronic ticketing system already in place like Brisbane it makes sense to use it to monitor usage, so you can precisely see each journey, and better plan scheduling and expansion. For example, you would be able to see how many people pass through the two CBD stations crossing the North/South divide in the network. The new Cross River Rail expansion for example will be the first line that doesn't pass through Central.
1 comments

Bit of a bugbear of mine, but the cross river rail project is mostly a stopgap. Brisbane really needed standard gauge and double decker trains before it became so built up. We are already at trains per minute capacity for some of the inner city bridges, and duplication in the inner city is highly destructive. If we could increase the capacity of the vehicles themselves we would be way better off. But the cheap/compromise position is to just bypass the problem entirely.

Whats worse is that, theres a certain perspective, one of declining CBD use, where cross river rail makes a mountain of sense. But in that case we should be bypassing the CBD with a lot of room for expansion, ie, 8 lines worth of track. But this isnt being done either.

>When you have the electronic ticketing system already in place like Brisbane it makes sense to use it to monitor usage

This and being able to continue charging fines is why it was left in place 100%