|
|
|
|
|
by mothballed
228 days ago
|
|
Rural AZ >"my power company wouldn't let me use grid-tied solar without it being permitted." ? Nah they didn't give a shit what I connected it to. I literally stubbed a 200 amp service entrance on vacant land then just went wild connecting it to whatever I like. I shot the shit with their engineer when they ran secondary off the power pole and that was it, I've never seen them again. > no government inspectors are coming by anyway, then it doesn't matter. I don't know for certain but having an unpermitted solar panel visible via satellite would likely trigger a visit. |
|