|
|
|
|
|
by imtringued
244 days ago
|
|
The point is that the success rate needs to be 99% and safety needs to be 100%. You're not allowed to take shortcuts. That's what makes it difficult. Also VLMs/LAMs aren't going to cut it. You're going to need something like TDMPC. |
|
However, safety rate doesn't need to be 100%. If you can keep the failure probability as low as the probability to be hit by a random asteroid falling from the sky, that's good enough.