|
|
|
|
|
by antonvs
256 days ago
|
|
> A software engineer would never just slop out an entire feature based on the first discussion with a stakeholder and then expect the stakeholder to continuously refine their statement until the right thing is slopped out. That's just not how it works and it makes very little sense. Didn’t you just describe Agile? |
|
Sorry couldn’t resist. Agile’s point was getting feedback during the process rather than after something is complete enough to be shipped thus minimizing risk and avoiding wasted effort.
Instead people are splitting up major projects into tiny shippable features and calling that agile while missing the point.