|
|
|
|
|
by ChrisMarshallNY
290 days ago
|
|
Fair point, but we should look at the length of time from napkin sketch to first delivery of final product; not just the design. I understand that the manufacturing and testing was a nightmare, with the need to redesign multiple subsystems. |
|
As far as credible 5th generation strike fighters go, that's a pretty cheap per-squadron price tag. My bigger gripe is with the "Big Bomb Diplomacy" tactics that require such a platform, but we'd end up wanting one either way if a fight with China is in the cards.