|
|
|
|
|
by systemerror
302 days ago
|
|
The big issue with LLMs is that they’re usually right — like 90% of the time — but that last 10% is tough to fix. A 10% failure rate might sound small, but at scale, it's significant — especially when it includes false positives. You end up either having to live with some bad results, build something to automatically catch mistakes, or have a person double-check everything if you want to bring that error rate down. |
|