As far as I know, Global Foundries ceased efforts at 7nm and lower because they could not afford it.
They had previously signed a contract with IBM to produce silicon at these more advanced nodes that they could not honor, and there was legal action between them.
Yeah and IBM had to move their designs in the last minute from GF to Samsung. I have heard that the Samsung process was much better and the tech transfer was easier than expected.