|
|
|
|
|
by slyall
351 days ago
|
|
There will be versions of the machine that automate more of the process. But they will cost money and require maintenance too look after and adjust. I used to work a similar job[1] at a plastics factory. We had about 12 machines in the area I worked. Some machines automated remove stuff from the mold, some removing the excess, some putting though the leak tester. Each stage of automation was an additional thing that had to be configured and adjusted. Often we'd only make an item for a shift or two. At one point the company bought a new machine (the size of a 2 car garage) that automated some more bits. The machine took 18 months of adjusting before it worked reliably. [1] Blowmold, ranging from 750ml bottles, 5-20 litre jerry cans, sections of culvert pipe. |
|
That doesn’t tell the story of the overall ROI. After 18 months of shakiness were those folks able to go do other work? Did the work pay for itself on a 5 year timeline? 10 years? Achieving reliability is huge - did the company spin that for PR?