|
|
|
|
|
by helge9210
382 days ago
|
|
> biggest control-freaks "control-freak" not necessary. For any known sequence/set of feature requirements it is possible to choose an optimal abstraction. It's also possible to order the requirements in such a way, that introduction of next requirement will entirely invalidate an abstraction, chosen for the previously introduced requirements. Most of the humans have trouble recovering from such a case. Those who do succeed are called senior software engineers. |
|