|
|
|
|
|
by wizardOfScience
399 days ago
|
|
The crane manufacturing business case is not driven by material efficiency to the same degree. It is a tool that needs to be reliable and have performance in operations. Limit the need for man hours through ease of use etc. It should also be able to take many assembly/disassembly cycles. Thus does the amount of material not matter as much in a crane. For wind turbine towers the material cost can be >>50% of the installed cost. |
|