by terom
410 days ago
|
|
It looks like the Iberian peninsula is relatively isolated from the rest of the CESA synchronous grid, with only 2% cross-border capacity compared to local generation. [1] There's a map at [2] > The Spanish electricity system is currently connected to the systems of France, Portugal, Andorra and Morocco. The exchange capacity of this interconnection is around 3 GW, which represents a low level of interconnection for the peninsula. The international interconnection level is calculated by comparing the electricity exchange capacity with other countries with the generation capacity or installed power. [1] https://www.ree.es/en/ecological-transition/electricity-inte... [2] https://www.entsoe.eu/data/map/ |
|
https://www.rte-france.com/eco2mix/les-echanges-commerciaux-...
https://transparency.entsoe.eu/transmission-domain/physicalF...