Hacker News new | ask | show | jobs
by gblargg 478 days ago
So there are two capacities, that of the well and that of generation (oversized with respect to the well). On average this varying scheme utilizes the well at 100% of capacity (the expensive part to increase), and the turbine generation at less than 100% capacity (not expensive to oversize).