|
|
|
|
|
by gblargg
478 days ago
|
|
So there are two capacities, that of the well and that of generation (oversized with respect to the well). On average this varying scheme utilizes the well at 100% of capacity (the expensive part to increase), and the turbine generation at less than 100% capacity (not expensive to oversize). |
|