Fervo's initial demonstration project was next to an existing power plant in Nevada which previously failed to produce at it's stated capacity over time (Battle Mountain) so they were able to tie in extra MWt capacity to an existing ORC turbine. Fervo's technology has to be located somewhat near existing traditional hydrothermal geothermal resources because it's the convection along an exiting fault for hundreds of thousands of years that produces an above background thermal gradient near enough to the surface for it to be economical. That is true for their demonstration area in Utah which is located near the existing Blundel geothermal power plant in Milford Utah. |
|
I don't agree with the above comment:
> Fervo isn't just trying, they are succeeding