Y
Hacker News
new
|
ask
|
show
|
jobs
by
milianw
491 days ago
initially yes but then the local power supplier will come and install a bidirectional meter
1 comments
pintxo
491 days ago
In Germany, as long as the inverter output is capped at 800W (and solar Wp at 2kWp), no bidirectional meter is needed.
link