Hacker News new | ask | show | jobs
by zdragnar 519 days ago
I took a small rabbit hole run into bauxite smelting when I found out a local place had their own power plant just for the process. It really does require that much energy.

If the Brazil plant is putting out enough ore, I can definitely imagine it is cheaper to sell it internationally to someone with hydro power than to build and operate their own power plant.