|
|
|
|
|
by dhosek
534 days ago
|
|
My parents’ home, built in the 1950s was built from pre-fabricated components. From what my dad says (his mother was the original owner of the home), the fit of walls was very poor and they had to do a lot of patching to fill in gaps between the walls and the ceilings. There have been numerous attempts at prefabricated building but all have failed to gain any traction. |
|
Right now most new houses have the wood framing CNC manufactured based on plans, shipped to the building site and assembled, then modified as needed by the builder.
Our roofs are almost exclusively steel, which are also CNC cut and shipped to the site and installed by roofers.