|
|
|
|
|
by rootedbox
542 days ago
|
|
Sure there is. It's a ratio of inputs to outputs.. even in the example the inputs and outputs are measurable. The only thing this article gets at is that engineers may not know how to calculate their own productivity; but it doesn't means it's not calculable. |
|
But reality is never that clear cut. How’s the ratio look when:
- Peter goes to the park and the breakthrough doesn’t come?
- Or it comes 3 weeks later?
- Or he deletes 100 lines of code and introduces a new bug?