|
|
|
|
|
by bryanlarsen
546 days ago
|
|
We modernized and rationalized the Space Shuttle to make the SLS and each SLS costs > $4B. Building Saturn V's at low volume under the standard cost-plus arrangements that NASA uses with Boeing et al would result in steadily increasing costs. |
|
Except we didn't, because we took absurdly high-end engines (RS-25s) that were designed for reuse and refurbishment and now we drop them in the ocean after every launch.