|
Hey guys, I am the guy behind the OpenERV company, who designed the TW4 and WM12 ERV units. I'm sorry I don't have a bunch of units ready to ship out, as the site says it's still in beta, I am to be honest kind of taking my time because I have another project, the big quiet fan, which is actually funded a little better, and thus I've been directing most of my time to that. But I do advance this a bit most days. I have a twitter where I tweet my progress : @open_erv, and also I'm on bluesky. I have shipped a few units to other engineers who have/will test the units so I can share third party confirmation for any skeptics. To clarify some of the discussion, it is not a counterflow heat exhanger, it is a regenerative type. https://en.wikipedia.org/wiki/Regenerative_heat_exchanger. I prefer this type because they can recover latent heat more effectively than recouperative (such as counterflow) type, and latent heat is 40-50% of the total energy content of the air, seasonal average in Ottawa or Toronto. I am hoping to get the machine tested by the PassiveHaus institute to show beyond doubt how good the efficiency is with a third party test. I have no doubt, I have tested it myself, though. These can theoretically handy any temperature differential, but the TW4 and WM12 are currently made of a polymer that I wouldn't trust in an extremely hot climate combined with direct sunlight. For that reason, I am focussed on cold climate scenarios. I am pretty sure it will not frost up even in extremely cold weather like -30. I used it last year in my window and had no problem, and it did get to like -25 at least iirc. |
Anyway, I've tried to turn the very temporary influx of interest into something positive and lasting by searching for 2 people who can install and document the install of a pair of TW4 energy recovery ventilators, so anyone who wishes to buy thereafter can know what they are in for on that count. There is another guy Alex who will test flow and efficiency, I've already sent him the stuff.
So we get things tested and verified, and I will continue getting a jump on producing units by running the printers and assembling in between when I am doing the more respectably paid work in my life. The kits are on the back burner because even I am still stabilizing the assembly methodology. I even added a new component just recently, a flow straightener that boosts flow by about 10% while allowing noise to be reduced even further.
So stabilize, verify, produce, and then after that, within a couple months, I sell in a more or less ordinary way to anyone who wants them. I'm sorry it's not in time for the cold weather, but we have to remember ERV is about the big picture and long term. Like the rest of a building, it's an investment, and the machines are made for (very) good return and long lifespan.
I will prepare some WM12 units for those who have asked for them. To be clear I only got 12 emails expressing interest, not an absolute flood, but it's encouraging to know some people "get it" at least. I knew there would only ever be a small trickle of relatively wise people from around the world that appreciate good performance and return on investment. I only need to sell a few pairs per month to make it worthwhile, at the eventual $1300 CAD price tag.
I am open to scaling up production with more efficient production methodologies, but I am actually fairly well acquainted with injection molding, machining and other conventional approaches, and they aren't magic. They would help for sure but they wouldn't radically change the price, or the rate of return on investment, and they also take a lot of investment not just for tooling but also re-testing and re-design. I've also changed the design so, so many times after I thought it was done I am highly wary of being locked in.