> Design pipelines are deep and Intel at the time famously had very node-specific designs without industry-standard PDKs. The moment engineers were told to switch a design to 14nm, it basically reset the 5 year design-to-product pipeline. Right. It was well-known publicly that Intel was running their business in a way that maximized the damage any fab troubles would have on their product roadmap. It was obvious a decade ago that Intel needed more flexibility to bring their CPU designs to other fab processes. It took them too long to start working on Rocket Lake, and too long to deliver it. But they have at least made some progress on the problem, since they've been selling x86 CPU cores made at TSMC for the past year. (On a related note: Buying Altera and forcing them to port their entire roadmap over to a broken 10nm process was made even more stupid by the fact that Intel didn't have a usable PDK that outsiders and acquisitions could work with.) |
|