|
|
|
|
|
by lmm
583 days ago
|
|
> Or does a 75mph freight railway cost as much as a 250mph passenger railway? No, it costs more. The most expensive part of building anything in the UK, by far, is getting it through the local planning process, and as hard as that is with a sexy passenger railway that local residents can see a direct benefit from, it's much harder for a freight railway. Also freight railways need a much flatter route, which makes the route more constrained (increasing planning costs) and means more need for bridges and tunnels (increasing everything costs). |
|