by growse 580 days ago
Performing major works on an existing line to upgrade its speed (which, given alignments might not even be possible) is probably the worst-case scenario in terms of cost and disruption.

For the WCML specifically, _we already did that_ in the form of the modernization program (early-2000s) which was over 10 years of disruption, and massively expensive.

And HS2 isn't just for freight, it's also for providing higher capacity and frequency of local stopping passenger trains. The WCML already connects the population centres, so the local stopping trains have to stay there. The thing that really kills capacity is the co-mingling of 125mph and lower speed (90/75) traffic. Remove the 125mph traffic (onto, say, a dedicated high-speed single-mode line) and you _massively_ increase capacity on the existing line.

> A reminder that the cost of the project, even unfinished, with none of the benefits of the lines to Manchester and Leeds, is of the same order as NASA's current moonshot budget.

This is not a railway problem. This is a government problem.