That's just the panels. So, I buy a bunch of panels, they get dropped off by a truck, and then...? I'm going to use slave labor to assemble it all and wire it all up? The price for installed solar in the US isn't high because of the panels. Its high because of the labor costs. |
|
Well, the USA is one of the few places left that still uses that, so you could…
But even without that, the linked product is the kind of thing two untrained people can do 95% of the installation in an afternoon, with the rest being a trained professional checking the wires and doing the final connection to the grid.
If this was done in a place that already has nearby grid access:
8 h * {$25/h unskilled labour} + 0.5 h * {$50/h electrician} = $225 per one of those, assuming you're doing enough of them to hire at full time rates not contractor rates.
And that's a car port, it isn't designed for optimal installation time.
If they need to also add their own connection to a more remote grid, well I've seen quotes of €10k for stuff like that around here, which is still cheap enough that you could do each of those on an entirely separate new not yet connected plot of clear land at domestic rates and still be cheaper than the quoted example in the USA.