Do we need that much storage, though? Presumably we won't have the hydrogen-powered generation capacity to use that much energy quickly, so the comparison to utility-scale batteries isn't quite apples-to-apples. From the article about the Chevron project: > The project will initially provide fuel to the Intermountain Power Project, an 840-MW blended gas power plant also under construction in Delta, but Chevron believes there will be opportunities to supply hydrogen to the transportation and industrial sectors as well. So even if the hydrogen storage facility was full, we're still limited to 840 MW of generation capacity. Sure, we get ~350 hours of runtime, but that's not really needed. The Bath County Pumped Storage Station has 3003 MW of generation potential, with 11 hours of runtime from full. Looks like the Moss Landing project is rated to be able to discharge 1/4 of its capacity per hour, so that 3 GWh facility can provide 750 MW. Batteries also have the advantage of being able to be sited much closer to the end user. |
|