by fooqux
615 days ago
|
|
I don't understand why you're coming about this problem from a "100% nuclear" situation. That's not the case for the world, and likely never will be the case. But heck, let's assume all you've got to work with is nuclear. You have a baseload. That's basically the minimum load that always exists. You don't have to worry about selling the power, it's already sold. And then you have peak. Both of these are time / weather dependent but we're still quite able to plan days, if not weeks and months, in advance for what those two values will be. As an example, let's get back to the original topic of the article. If you're Google and you have a particular datacenter at a location, you know what that baseload is. You know what the peak is. It's a pretty simple calculation to figure out what is most cost-effective here. It's probably even easier for you than the local power company, as base and peak loads likely don't fluctuate much for you outside of HVAC keeping up with weather. It might be to use nuclear for just base load and use the local grid for the rest. It might be to over-produce occasionally because that's still cheaper than buying from the local system operator. Hell, you can probably sell any access, but that's more of a problem than most people think. But the point is nuclear is king when it comes to baseload power supply. And a datacenter, which consumes a lot of power consistently, is almost entirely baseload. |
|