AIUI, Poland has a bunch of generation sites that were small/medium in size that were around former coal mines, and so a lot of the transmission infrastructure is already present. It's just that they can't go 'too big' in those places as they'd have to spend a lot more on grid upgrades instead of 'just' a 1:1 replacement with SMRs.