|
|
|
|
|
by _zoltan_
648 days ago
|
|
we have a """problem""" of physical labor being too expensive. I put it in question marks as I have no solution (I don't want to rob people of their primary income source), but it's really getting out of hand. I had two spigots installed on an already there pipe, on two ends. 1100 chf. material cost was 400, the rest is labor at 125/h. So I just tend to learn a lot of this stuff from YouTube, but obviously I do a lot worse job than someone doing this for years as a living. |
|