|
|
|
|
|
by ungreased0675
657 days ago
|
|
I’m a PM, and this is great advice. Technical debt can mean a lot of things, and some of those I intentionally don’t prioritize. If I suspect it’s a resume-driven development thing, straight to the bottom of the backlog. |
|