|
|
|
|
|
by ggm
669 days ago
|
|
Proof of concept in my workplace works for tech and design. It dies in the c suite who obsess with L&F and their favourite feature. At one remove, showing them prototype as mvp tickles this out but the "cost" in alienating the decision makers may be too high. Training senior management to look beyond wireframes and lorum ipsum can be hard. Consider that significant buildings were born from napkin sketches. I consider this problem pretty dire, but there you go. I'd say a 3rd iteration of an mvp should be good, better at least. Holding them off from looking at it and getting permission to a/b test in public might be hard. |
|