by avalanche123
5124 days ago
|
|
This was my initial idea. However, consider this scenario. I need to boot a web stack (db master, pool of db slaves, webservers and a load balancer). I boot a master, job succeeds, then I boot slaves, job succeeds. I boot webservers, but by this time master is shut down or becomes unavailable. Because of a job-based approach, this will never be detected and fixed by the controller. The chosen approach would detect the state of the environment and determine that a master is missing and proceed to correct the situation or abort the process altogether. Hope this makes sense! |
|
More generally, looks like you just form a DAG to map out the dependencies and use it to figure out what to do. The daemon could then periodically traverse the DAG starting from the root to each leaf starting jobs as required. Could you explain why this kind of approach was unfeasible in your scenario?