Odd to see the Elizabeth Line (Crossrail) presented in such a positive light. As an engineering project Crossrail became famous for being repeatedly delayed (eventually opening four years late) and many billions over budget. Since opening the Elizabeth Line has been beset by high numbers of service cancellations and poor punctuality (usually blamed on having to share track outside the central tunnel section with other operators). |
|
According to the ORR's (Office of Road and Rail) first annual report after opening the central section of the Elizabeth line, passenger numbers have exceeded their "post-pandemic optimistic scenario" and the line is on course to be revenue-positive within a few years.
More details in this London Reconnections post here: https://www.londonreconnections.com/2023/the-state-of-rail-b...