|
|
|
|
|
by caminante
735 days ago
|
|
No. The parent said that the quality control should be on the supplier, not Boeing. This is instead of a joint problem with Boeing validating. Look at the repercussions. Boeing gambled on shaving procurement oversight and lost. |
|