Hacker News new | ask | show | jobs
by toomuchtodo 748 days ago
No need to remove the tunnel if you prefer not to. Rigid foam to a depth that meets the R value for your zone and AHJ requirements (“local code”). Check if any inspection is required before drywalling over the rigid foam.
1 comments

Thank you
Happy to help, enjoy the project!