by HarHarVeryFunny
764 days ago
|
|
Google search for "largest solar farms" or similar, but my bad - should have checked the date of the source. The point I was trying to make, echoing Zuckerberg (who noted that power, not chips or data, is the constraining factor for further LLM scaling), is that power needs to be near to the data center, else the lead time and red tape will be even longer. If we're considering clean power then solar is an option, which limits datacenter location to where that is viable on this 1GW scale. It's funny that you're the second person in this thread to assume that just because the data was wrong (out of date as it happens) it must have come from an LLM (which it didn't). I guess this is the world we are moving into, where all content is suspect of being AI generated and therefore suspect! |
|