Hacker News new | ask | show | jobs
by krisoft 771 days ago
I don’t think ragebol meant that the bridge rolls forward with traffic on it. Just that once a 100m long stretch is finished they can roll the bridge 100m forward with the traffic re-routed or suspended during the repositiong. If they time it right the resurfacing can be done with minimal disruption in the dead of night.