Hacker News new | ask | show | jobs
by bobthepanda 768 days ago
hence why the work requiring the stopping and redirecting happens at night.
1 comments

They can only complete 100m once every 12 hours?
with minimal road disruption, though.

at least where I live you'll often seen lane reductions measured in weeks for repaving.

I've seen projects to pave only a few miles take years. Not even roads that are that busy, even.
That doesn't sound right, assuming a lane width of 3.5m, they can only resurface roughly 29 square meters an hours?

With all that equipment and manpower.

you need to scrape all the way to the base and then fill back in when repaving. and you also can't lay asphalt in rain.