by dekhn
778 days ago
|
|
But who did the wiring? Even with blades which consolidate much of the cabling, there's still a tremendous amount of work to build the interconnect. On typical large systems I've seen a small team 3-5 guys working weeks+ to wire a modest DC. |
|
For this venture, again, we are starting small, so we are just flying to the DC and doing it ourselves. There are also staff there that are technical enough to swap stuff out when we need it. The plan will be to just hire one of their staff as our own.
I don't think we will make it for this next deployment due to time constraints, but ideally in our near future, we will go full L11. Assemble and ship out full racks at the manufacturer/VAR, bolt em down, wire them up and ready to go. That is my dream... we will see if we get there. L11 is hard cause a single missing cable can hold up an entire shipment.