Hacker News new | ask | show | jobs
by Geisterde 843 days ago
I believe only reactors used in the navy have this characteristic, the poison transients from adjusting load to quickly (and maybe having to shim for temperature) on a commerical reactor are liable to cause an unplanned shutdown.