|
|
|
|
|
by buffet_overflow
834 days ago
|
|
The analogy I used back when I managed a team was that our workload was like a funnel. You need some amount of overhead to balance the pressure and keep things flowing. If you put too much in the funnel, things backup and spill. It's faster to leave that little gap than it is to try to use the absolute maximum volume. |
|