That’s interesting.
The quotes for the nuclear power plant are really low though.
France, which has a lot of knowledge and trained workforce for nuclear, is slowly building a reactor of 1.2gwe for like 20B euros.
If you use those numbers… it looks very different.
And that’s at least not idealistic price since it’s they are completing the construction. |
|
https://english.hani.co.kr/arti/english_edition/e_national/8... talks about the Shin Kori 3 and 4 reactors (brought online in 2016 and 2019) costing $6.4B USD for the pair (after a 32% cost overrun), if I'm reading correctly. Those ones are 1416MW and 1418MW, or $2258/kW which is right in line with GE's estimate of a next-of-a-kind SMR build (spec sheet says $2250/kW)