I am interested in the back of the envelope calculations you did to come to this conclusion. Would you please elaborate if possible?
I know of an early stage YC startup that has a 6TB Postgres DB.
Would it be fair to say that the DB hosting (neglecting replica, engineering time) can be done at $150/month?
I know of an early stage YC startup that has a 6TB Postgres DB. Would it be fair to say that the DB hosting (neglecting replica, engineering time) can be done at $150/month?