i dunno about tunnel... i am not a digger but I don't think digging 26 meters (highest point of canal) would require tunneling... just dredging.
1 comments

You'd have to deal with the Chagres (assuming the current drought ends) as well.

The original excavation was done mostly dry and massive by any standards: 27kt of dynamite were used.

I'm also not a digger, but 26 meters of dredging over a 13km distance sounds crazy expensive. You would have to also widen the valley to prevent landslides into the canal.