|
|
|
|
|
by naasking
892 days ago
|
|
> For large endeavors (building a plane) it is impossible to formulate all contributions to all quality criteria/cost and constraints into a technical engineering optimization problem. It's obviously possible, SpaceX vs. NASA is an existence proof. Maybe you have something specific in mind when you say "technical engineering optimization problem", like a formula you can minimize mathematically to account for every little contribution, but this often isn't necessary. Like when solving physics problems using approximations, you often only need to minimize the first and second order largest contributors to the cost and you'll be in the right ballpark. This also means you don't need to find the literally absolute minimum and capture literally all of the contributors to the cost during the design process. And of course this is what happens in the real world already, do you think accountants and pointy haired bosses guiding a bunch of engineers are going to find the absolute minimum? Of course not, they find what looks like a minimum from their limited view of a project after the engineers estimate the costs of producing parts and the labour required. Just close the loop without the accountants and bosses and engineers can do this optimization themselves. |
|