Hacker News new | ask | show | jobs
by Cacti 894 days ago
The book couldn’t have been that good if it never got across to you that an airplane hitting production in 1997 was necessarily designed YEARS BEFORE 1997 (and hence the merger).

Boeings problems were long in work before the MD merger. Many commercial aerospace people in Seattle, particularly ones with parents who worked at Boeing, have struggled to come to terms with that, and there are a lot of rose colored glasses around here of what 1995-1997 Boeing looked like.

1 comments

It's likely this particular issue is from a lack of quality control, and you cannot blame that on 1997 Boeing.

Quality control degradation in my experience and from stories i've heard are exclusively the fault of bean counters and exec pushing for cost cuts (unlike design flaws where the engineers share the blame). I've heard a story about an industrial machine amputating someone because the new joints couldn't handle the pressure (in france, pre 2019, i don't have the specifics). The maintenance guy wanted to replace the joints with high quality one (like the original were), but they were deemed "too expensive" so they bought new joints at half cost, to gain 10€ on the maintenance of the 400k machine. Less than a week later, the machine broke, someone lost an arm or something (don't have specifics), and a new machine had to be shipped and given for free, i don't know who paid the the amputated guy.