|
|
|
|
|
by walrus01
921 days ago
|
|
Anyone who knows outside plant fiber could have told you this was a recipe for disaster. The only way to "micro trench" fiber that will last is using a big-ass diamond bladed wet saw, like 10 to 12 inches down and then fill the slot with proper concrete/pavement grouting. NOT two inches down and filled with black rubber stuff. Vancouver BC has an extensive microtrenched fiber network in the busy downtown core, crossing many roads, and it's relatively trouble free. |
|
I've seen proper trenching with a 30" diamond saw the last bit from a telephone pole to a commercial building. The fiber ran as far as it could using public right-of-way to save installation labor costs.